The Saratoga Sun -

Bridge project underway

 

The town of Saratoga is moving forward with a project to install a bridge connecting the hot pool area to Veterans Island, after a three-year delay.

“This is something that we have wanted to get accomplished for a long time, and I think that it is something that the local people and tourists are going to really enjoy,” said Public Works Director Chuck Bartlett.

The town applied for a $150,000 Transportation Enhancement Activities-Local (TEAL) grant through the Wyoming Department of Transportation in 2010 for a bridge to connect the hot pool area and Veterans Island. However, the projec...



For access to this article please sign in or subscribe.



 

Reader Comments
(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2018